Integration

Typically 10-20% of total project cost. Connecting the ERP to surrounding systems — CRM, e-commerce, banking, EDI, warehouse, payroll, BI. Each connector is its own micro-project.

What's included

  • Per-system integration design
  • Connector development or licensing
  • Identity / SSO integration
  • Real-time vs batch sync architecture
  • Error handling and reconciliation
  • Performance testing under realistic load

Common overruns

  • Connector vendor fees materialise after architecture is locked in
  • Custom integrations that need rebuilding at each ERP upgrade
  • Volume / throughput requirements discovered only at go-live
Source

Aggregator synthesis 2026.

Verified 2026-06-02
Other phases
01Discovery & design02Licences (year 1)03Configuration & customisation04Data migration06Training07Change management08Hypercare (3-6 mo post-go-live)